Clear, site-specific risk assessments and method statements underpin the safe and controlled delivery of all maintenance work.
Risk assessments are produced in the context of the work scope, structure and operating environment, identifying hazards and defining proportionate control measures.
From this, a detailed method statement is developed, setting out the safe system of work for each stage of the task, including access arrangements, protection measures and rescue planning.
At Evolve, safety comes first with thorough risk assessments and safety method statements (SMS), identifying and managing risks at every stage to protect teams, clients, and assets.

© 2024 Evolve Rope Access. All rights reserved.